200K Brevet · 2026-10-17 · Start 06:00 PT
Winters 200k - 2025 route ● Live
127 mi ·
7,248 ft · ACP cutoff 13.5h · 1 rider registered
Miles
K ft
Difficulty
Avg mph
6
Controls
14 stops
0
Headwind
segments
12h15
Elapsed
12h15 moving
+1:15
Time bank
cutoff 13.5h
Journey
Hover or click a stop — table below stays in sync
Start
Control
Rest
Waypoint
Finish
Move across the map or elevation profile to inspect the same route position.
descent
0–3%
3–6%
6–9%
9–12%
12%+
Itinerary · 14 stops
6 controls
| # | Stop | Seg | Cumul | Climb | Pace | Elapsed | ETA | Bank | Wind | Tuf?
Toughness (0–10) — how hard each segment is, combining:
• Climbing (ft per mile) • Headwind — counted as the climb it physically equals (≈12 ft/mi per mph), ×1.25 for the mental drain of a relentless headwind (≈15 ft/mi per mph applied) • Temperature — 0 in a ~50–68°F comfort band; rising penalty in heat (the bigger effect) and a smaller one in cold 0–3 easy 3–5 moderate 5–7 hard 7+ brutal |
|---|---|---|---|---|---|---|---|---|---|---|
| 🚩 |
Willow Ave Park and Ride, Hercules CA
|
— | 0 | — | — | 0h00 | 06:00 PT | — | — | |
| ◆ |
Control #2: Open Control - Benecia Martinez Bridge trail
Rolling segment - about 1000 ft climb
|
14.2 | 14 | 73/mi | 1h05· 13.1 | 1h05 | 07:05 PT | +0:25 | — | 4.6 |
| ☕ |
Refuel
|
— | 14 | — | 5m | 1h10 | 07:10 PT | +0:20 | — | — |
| ☕ |
Shell on 4450 Central Way off Pittman road, Cordelia
Lake herman climb and few misc climbs
|
21.8 | 36 | 69/mi | 1h45· 12.5 | 2h55 | 08:55 PT | +0:54 | — | 4.3 |
| ☕ |
Water refill + refuel at Shell
|
— | 36 | — | 15m | 3h10 | 09:10 PT | +0:39 | — | — |
| ◆ |
Control #3: Winters city park - 4th and Main
Mostly rolling/flat
|
29.9 | 66 | 34/mi | 2h30· 12.0 | 5h40 | 11:40 PT | +1:20 | — | 2.1 |
| ☕ |
Water refill
|
— | 66 | — | 5m | 5h45 | 11:45 PT | +1:15 | — | — |
| ◆ |
Control #4: Manned control - Lake Solano county park
|
4.2 | 70 | 25/mi | 20m· 12.6 | 6h05 | 12:05 PT | +1:21 | — | 1.6 |
| ☕ |
Picnic Lunch at control
|
— | 70 | — | 30m | 6h35 | 12:35 PT | +0:51 | — | — |
| ◆ |
Control #5: Manned control - Moskowite corner
three 500 ft climbs - distance 6 miles. 10 miles flat. rest dh.
|
16.1 | 86 | 101/mi | 1h50· 8.8 | 8h25 | 14:25 PT | +0:44 | — | 6.3 |
| ☕ |
Water + refuel
|
— | 86 | — | 15m | 8h40 | 14:40 PT | +0:29 | — | — |
| ☕ |
Control #6: Rockville Power Market - Suisin valley @Rockville road
Small 2.5 mile 300 ft climb then all downhill. Possible headwinds
|
17.9 | 104 | 34/mi | 1h20· 13.4 | 10h00 | 16:00 PT | +1:03 | — | 2.1 |
| ☕ |
Water + refuel
|
— | 104 | — | 10m | 10h10 | 16:10 PT | +0:53 | — | — |
| 🏁 |
Finish at Willow Ave Park and Ride
Rolling segment - about 1000 ft climb. Last control will close at 8:30 pm not at 8:41 pm. Possible headwinds
|
23.1 | 127 | 58/mi | 2h05· 11.1 | 12h15 | 18:15 PT | +1:15 | — | 3.6 |
Choose your pace
Pick a pace — the itinerary above re-times live
3 ways to ride it
Pick the strategy that fits your goal — the times below are derived from the base plan with adjusted segment speed and night halt.
Comfort
+6% margin · safety buffer
12:59
Total elapsed
+0:31
Time bank
Willow Ave Park and Ride, Hercules CA
0mi
06:00
Control #2: Open Control - Benecia Martinez Bridge trail
14mi
07:09
Control #3: Winters city park - 4th and Main
66mi
12:00
Control #4: Manned control - Lake Solano county park
70mi
12:26
Picnic Lunch at control
70mi
12:58
Control #5: Manned control - Moskowite corner
86mi
14:55
Control #6: Rockville Power Market - Suisin valley @Rockville road
104mi
16:36
Finish at Willow Ave Park and Ride
127mi
18:59
⚠ Tight cutoff if conditions sour at the final controls.
Sign in to save
★ TEAM PLAN
Standard
Team plan
12:15
Total elapsed
+1:15
Time bank
Willow Ave Park and Ride, Hercules CA
0mi
06:00
Control #2: Open Control - Benecia Martinez Bridge trail
14mi
07:05
Control #3: Winters city park - 4th and Main
66mi
11:40
Control #4: Manned control - Lake Solano county park
70mi
12:05
Picnic Lunch at control
70mi
12:35
Control #5: Manned control - Moskowite corner
86mi
14:25
Control #6: Rockville Power Market - Suisin valley @Rockville road
104mi
16:00
Finish at Willow Ave Park and Ride
127mi
18:15
⚠ Most riders pick this pace.
Sign in to save
Push
-6% time · faster pace
11:31
Total elapsed
+1:59
Time bank
Willow Ave Park and Ride, Hercules CA
0mi
06:00
Control #2: Open Control - Benecia Martinez Bridge trail
14mi
07:01
Control #3: Winters city park - 4th and Main
66mi
11:20
Control #4: Manned control - Lake Solano county park
70mi
11:44
Picnic Lunch at control
70mi
12:12
Control #5: Manned control - Moskowite corner
86mi
13:55
Control #6: Rockville Power Market - Suisin valley @Rockville road
104mi
15:24
Finish at Willow Ave Park and Ride
127mi
17:31
⚠ High fatigue risk in the final stretch.
Sign in to save
Weather
Temp
—
Wind
—
Sunrise
07:15
Sunset
18:35
Fuel + breaks
All stops with a planned break
07:10
Refuel
0m break · Waypoint
14mi
08:55
Lake herman climb and few misc climbs
Shell on 4450 Central Way off Pittman r…
36mi
09:10
Water refill + refuel at Shell
0m break · Rest
36mi
11:45
Water refill
0m break · Rest
66mi
12:35
Picnic Lunch at control
0m break · Control
70mi
14:40
Water + refuel
0m break · Rest
86mi
16:00
Small 2.5 mile 300 ft climb then all downhill. Possible headwinds
Control #6: Rockville Power Market - Su…
104mi
16:10
Water + refuel
0m break · Rest
104mi
Riders · 1
1 registered
Mihir S.
Event: Winters 200k - 2025 route on 2026-10-17 —
1 registered at brevet pace.
Risks to watch
wind from forecast · light from seasonal heuristic · bank from cutoff
BANK
Tightest at Refuel: only +0:20 cushion against the ACP cutoff. Keep stops short here.
Winters 200k - 2025 route — Weather Forecast
Using ride plan timing for arrival estimates. Adjust the start to recompute.
Fetching route & weather data...
Wind Map
Headwind
Tailwind
Crosswind / Light
Arrow size = wind speed
Wind — total wind speed
Headwind / Tailwind — along riding direction
Weather Along Route
| Distance | Time | Temp | Wind | Direction | Head/Tail | Conditions | Precip |
|---|