200K Brevet · 2026-07-11 · Start 06:00 PT
SF to Cloverdale 200K ● Live
126 mi ·
5,932 ft · ACP cutoff 13.5h
Miles
K ft
Difficulty
Avg mph
3
Controls
5 stops
0
Headwind
segments
10h25
Elapsed
9h30 moving
+2:55
Time bank
cutoff 13.5h
Journey
Hover or click a stop — table below stays in sync
Start
Control
Rest
Waypoint
Finish
Move across the map or elevation profile to inspect the same route position.
descent
0–3%
3–6%
6–9%
9–12%
12%+
Itinerary · 5 stops
3 controls
| # | Stop | Seg | Cumul | Climb | Pace | Elapsed | ETA | Bank | Wind | Tuf?
Toughness (0–10) — how hard each segment is, combining:
• Climbing (ft per mile) • Headwind — counted as the climb it physically equals (≈12 ft/mi per mph), ×1.25 for the mental drain of a relentless headwind (≈15 ft/mi per mph applied) • Temperature — 0 in a ~50–68°F comfort band; rising penalty in heat (the bigger effect) and a smaller one in cold 0–3 easy 3–5 moderate 5–7 hard 7+ brutal |
|---|---|---|---|---|---|---|---|---|---|---|
| 🚩 |
Cloverdale
|
— | 0 | — | — | 0h00 | 06:00 PT | — | — | |
| ◆ |
Control #2: Guerneville
15m
|
35.0 | 35 | 35/mi | 2h40· 13.1 | 2h40 | 08:40 PT | +1:04 | — | 2.2 |
| ◆ |
Control #3: Bodega Bay - Diekmann
30m
|
21.8 | 57 | 46/mi | 1h40· 13.1 | 4h35 | 10:35 PT | +1:29 | — | 2.9 |
| ◆ |
Control #4: Point Reyes
10m
|
31.9 | 89 | 63/mi | 2h25· 13.2 | 7h30 | 13:30 PT | +1:59 | — | 3.9 |
| 🏁 |
Finish Control: East Bluff picnic area
|
36.0 | 125 | 49/mi | 2h45· 13.1 | 10h25 | 16:25 PT | +2:55 | — | 3.1 |
Choose your pace
Pick a pace — the itinerary above re-times live
3 ways to ride it
Pick the strategy that fits your goal — the times below are derived from the base plan with adjusted segment speed and night halt.
Comfort
+6% margin · safety buffer
11:00
Total elapsed
+2:20
Time bank
Cloverdale
0mi
06:00
Control #2: Guerneville
35mi
08:50
Control #3: Bodega Bay - Diekmann
57mi
10:51
Control #4: Point Reyes
89mi
13:55
Finish Control: East Bluff picnic area
125mi
17:00
⚠ Comfortable margin — easiest finish.
Sign in to save
★ TEAM PLAN
Standard
Team plan
10:25
Total elapsed
+2:55
Time bank
Cloverdale
0mi
06:00
Control #2: Guerneville
35mi
08:40
Control #3: Bodega Bay - Diekmann
57mi
10:35
Control #4: Point Reyes
89mi
13:30
Finish Control: East Bluff picnic area
125mi
16:25
⚠ Most riders pick this pace.
Sign in to save
Push
-6% time · faster pace
9:50
Total elapsed
+3:30
Time bank
Cloverdale
0mi
06:00
Control #2: Guerneville
35mi
08:30
Control #3: Bodega Bay - Diekmann
57mi
10:19
Control #4: Point Reyes
89mi
13:05
Finish Control: East Bluff picnic area
125mi
15:50
⚠ High fatigue risk in the final stretch.
Sign in to save
Weather
Temp
—
Wind
—
Sunrise
05:55
Sunset
20:30
Fuel + breaks
All stops with a planned break
08:40
Control #2: Guerneville
15m break · Control
35mi
15m
15m
10:35
Control #3: Bodega Bay - Diekmann
30m break · Control
57mi
30m
30m
13:30
Control #4: Point Reyes
10m break · Control
89mi
10m
10m
Riders
No upcoming event signups yet
Risks to watch
wind from forecast · light from seasonal heuristic · bank from cutoff
BANK
Tightest at Control #2: Guerneville: only +1:04 cushion against the ACP cutoff. Keep stops short here.
SF to Cloverdale 200K — Weather Forecast
Using ride plan timing for arrival estimates. Adjust the start to recompute.
Fetching route & weather data...
Wind Map
Headwind
Tailwind
Crosswind / Light
Arrow size = wind speed
Wind — total wind speed
Headwind / Tailwind — along riding direction
Weather Along Route
| Distance | Time | Temp | Wind | Direction | Head/Tail | Conditions | Precip |
|---|