200K Brevet · 2026-01-24 · Start 06:00 PT
Dillon Beach 200k plan ● Live
127 mi ·
7,389 ft · ACP cutoff 13.5h
Miles
K ft
Difficulty
Avg mph
2
Controls
12 stops
0
Headwind
segments
11h45
Elapsed
11h45 moving
+1:45
Time bank
cutoff 13.5h
Journey
Hover or click a stop — table below stays in sync
Start
Control
Rest
Waypoint
Finish
Itinerary · 12 stops
2 controls
| # | Stop | Seg | Cumul | Climb | Pace | Elapsed | ETA | Bank | Wind | Tuf?
Toughness (0–10) — how hard each segment is, combining:
• Climbing (ft per mile) • Headwind — counted as the climb it physically equals (≈12 ft/mi per mph), ×1.25 for the mental drain of a relentless headwind (≈15 ft/mi per mph applied) • Temperature — 0 in a ~50–68°F comfort band; rising penalty in heat (the bigger effect) and a smaller one in cold 0–3 easy 3–5 moderate 5–7 hard 7+ brutal |
|---|---|---|---|---|---|---|---|---|---|---|
| 🚩 |
Crissy Fields East beach
Start Control Point #1
|
— | 0 | — | — | 0h00 | 06:00 PT | — | — | |
| ☕ |
Pump Espresso coffee
|
25.0 | 25 | 53/mi | 1h55· 13.0 | 1h55 | 07:55 PT | +0:44 | — | 3.3 |
| ☕ |
Water refill
|
— | 25 | — | 10m | 2h05 | 08:05 PT | +0:34 | — | — |
| ◆ |
Pierce Point control
Control point #2
|
17.0 | 42 | 60/mi | 1h15· 13.6 | 3h20 | 09:20 PT | +1:07 | — | 3.8 |
| ◆ |
control point photo break
|
— | 42 | — | 5m | 3h25 | 09:25 PT | +1:02 | — | — |
| • |
Bovine Bakery
|
6.4 | 48 | 32/mi | 30m· 12.8 | 3h55 | 09:55 PT | +1:13 | — | 2.0 |
| ☕ |
Water refill
|
— | 48 | — | 10m | 4h05 | 10:05 PT | +1:03 | — | — |
| • |
K&A takeaway
Control point #3 at Dillon Beach
|
25.0 | 73 | 71/mi | 2h25· 10.3 | 6h30 | 12:30 PT | +1:17 | — | 4.4 |
| ☕ |
Lunch stop
|
— | 73 | — | 30m | 7h00 | 13:00 PT | +0:47 | — | — |
| ☕ |
Woodacre Market
|
30.2 | 104 | 62/mi | 2h40· 11.3 | 9h40 | 15:40 PT | +1:20 | — | 3.9 |
| ☕ |
Water break
|
0.4 | 104 | 0/mi | 10m· 2.4 | 9h50 | 15:50 PT | +1:12 | — | 0.0 |
| 🏁 |
Crissy Fields East beach
Final control
|
23.2 | 127 | 51/mi | 1h55· 12.1 | 11h45 | 17:45 PT | +1:45 | — | 3.2 |
Choose your pace
Pick a pace — the itinerary above re-times live
3 ways to ride it
Pick the strategy that fits your goal — the times below are derived from the base plan with adjusted segment speed and night halt.
Comfort
+6% margin · safety buffer
12:30
Total elapsed
+1:00
Time bank
Crissy Fields East beach
0mi
06:00
Pierce Point control
42mi
09:33
control point photo break
42mi
09:38
Crissy Fields East beach
127mi
18:30
⚠ Comfortable margin — easiest finish.
Sign in to save
★ TEAM PLAN
Standard
Team plan
11:45
Total elapsed
+1:45
Time bank
Crissy Fields East beach
0mi
06:00
Pierce Point control
42mi
09:20
control point photo break
42mi
09:25
Crissy Fields East beach
127mi
17:45
⚠ Most riders pick this pace.
Sign in to save
Push
-6% time · faster pace
11:00
Total elapsed
+2:30
Time bank
Crissy Fields East beach
0mi
06:00
Pierce Point control
42mi
09:07
control point photo break
42mi
09:12
Crissy Fields East beach
127mi
17:00
⚠ High fatigue risk in the final stretch.
Sign in to save
Weather
Temp
—
Wind
—
Sunrise
07:25
Sunset
17:20
Fuel + breaks
All stops with a planned break
07:55
Pump Espresso coffee
0m break · Rest
25mi
08:05
Water refill
0m break · Rest
25mi
10:05
Water refill
0m break · Rest
48mi
13:00
Lunch stop
0m break · Rest
73mi
15:40
Woodacre Market
0m break · Waypoint
104mi
15:50
Water break
0m break · Rest
104mi
Riders
No upcoming event signups yet
Risks to watch
wind from forecast · light from seasonal heuristic · bank from cutoff
BANK
Tightest at Water refill: only +0:34 cushion against the ACP cutoff. Keep stops short here.
Forecast unavailable — this plan has no RWGPS route attached.
Add one in the
plan info editor.